So today is Halloween, which marks two anniversaries for me:
* 21 years ago since I closed on my house.
* 10 years since I started my current job, making it by far the longest time I've worked at one place. My teaching career had 7 years at the institution where I served longest, 6 years at the second longest. All other positions were 3 years or less, over the 38 years since I finished my Ph.D. (Going for the full 40.)
Today also marks the end of the busiest week I've ever had at that job in 10 years. NINE client meetings in one week. The expectation is three per week, on average. It was daunting but I did it. I was at work until 11:30 on Monday, 10:30 on Tuesday, 9 on Wednesday, and 10:30 on Thursday, but I did it, so I am both proud of myself and annoyed at them. This comes from being responsible to two surpervisors who do not coordinate with each other, and one lives in Virginia and comes up to PA once a month, so the meetings with him tend to get clumped into a single week and the other supervisor, whom I otherwise adore, doesn't adjust for that. Admitedly she did have COVID two weeks ago and had to reschedule some meetings while she was sick.
So, other than work, I've actually managed to have a little bit of "life" outside of that. Last weekend, I went for a ride on the Colebrookdale Railroad, about 40 miles south of me. They restore classic Pullman railroad cars. I'll upload my photos when I can (right now it's not working), but we were in the Maine Central car, which was absolutely gorgeous, and we took the opportunity to walk through all the other cars to the Open Car at the rear. (I met up with a friend, my former accounting professor and mentor when I was retraining back in 2003-08 (one class at a time, since I was also teaching full-time while I took classes). See https://www.colebrookdalerailroad.com/train-cars/
Then this weekend I'll go to see the Elizabeth Holmes documentary with a friend. I also did a "breast cancer" walk with other members of the firm I work with two weeks ago, and at the beginning of the month, I met up with another friend and toured the exhibits at the local art museum. I'm currently arranging to have dinner with another couple of friends sometime during the first half of November. All of this is much more than I've done in the past year. I need to take another blood test, but I'm hopeful that the iron tablets I've been taking (on a revised schedule of alternate days, away from coffee, and in conjunction with vitamin C and lactoferrin) are finally kicking in to reverse my low ferritin levels, which is what I think just depleted my energy starting around this time of year in 2025. Just taking the iron itself didn't do anything; I had to make those other adjustments (with the help of AI) to get it to work. I'll schedule another blood test for the first half of November to get some confirmation.
Then there are the other home improvements--the front and back doors in early September downstairs windows in mid-September, and yesterday and this morning, a full rebuild of the chimney and a new chimney liner. I got three estimates. Two were done by drone and one by actually going up on the rooftop for a manual inspection. The two who inspected by drone recommended the same thing--rebuilding just the top, while the one who went up there in person to look recommended a full rebuild. I live in a twin home and the chimney belongs 50% to the neighbor, so I had to coordinate with her. We went with a company that did one of the drone inspections. Then when the workers arrived yesterday and looked in person, they changed the recommendation to a full rebuild. They said that if they'd recommended the full rebuild at the original estimate, it would have been $3,600 more ($1,800 each), but because this was a last minute change, they brought that down to $3,000. My neighbor was pretty upset and after she talked with them, they brought the additional down to $2,800 ($1,400 each). They showed me video, pulling bricks out by hand because there really was no mortar left holding things in, so I know it needed to be done. Anyways, that job is now complete--and lesson learned, if you are getting any work done on the roof, insist on a manual, not drone, inspection!
Now I'm just waiting to get a date on the roof installation. They had someone out here on 10/20 to take measurements and told me they would have a date for me within two weeks, so I should know that soon. It will be the end of November or the beginning of December. I went with a Durolast/PVC roof, not a rubber/EPDM roof, which allows installation later in the season (and which is supposed to be more energy-efficient and fire-resistant and have lower long-term maintenance costs, but a higher up-front cost). So three of this year's four big projects are done!