Layout:
Home > Archive: October, 2026

Archive for October, 2026

October doings

October 31st, 2026 at 03:30 pm

So today is Halloween, which marks two anniversaries for me:

* 21 years ago since I closed on my house.

* 10 years since I started my current job, making it by far the longest time I've worked at one place.  My teaching career had 7 years at the institution where I served longest, 6 years at the second longest.  All other positions were 3 years or less, over the 38 years since I finished my Ph.D.  (Going for the full 40.)

Today also marks the end of the busiest week I've ever had at that job in 10 years.  NINE client meetings in one week.  The expectation is three per week, on average.  It was daunting but I did it.  I was at work until 11:30 on Monday, 10:30 on Tuesday, 9 on Wednesday, and 10:30 on Thursday, but I did it, so I am both proud of myself and annoyed at them.  This comes from being responsible to two surpervisors who do not coordinate with each other, and one lives in Virginia and comes up to PA once a month, so the meetings with him tend to get clumped into a single week and the other supervisor, whom I otherwise adore, doesn't adjust for that.  Admitedly she did have COVID two weeks ago and had to reschedule some meetings while she was sick.  

So, other than work, I've actually managed to have a little bit of "life" outside of that.  Last weekend, I went for a ride on the Colebrookdale Railroad, about 40 miles south of me.  They restore classic Pullman railroad cars. I'll upload my photos when I can (right now it's not working), but we were in the Maine Central car, which was absolutely gorgeous, and we took the opportunity to walk through all the other cars to the Open Car at the rear.  (I met up with a friend, my former accounting professor and mentor when I was retraining back in 2003-08 (one class at a time, since I was also teaching full-time while I took classes). See https://www.colebrookdalerailroad.com/train-cars/

Then this weekend I'll go to see the Elizabeth Holmes documentary with a friend.  I also did a "breast cancer" walk with other members of the firm I work with two weeks ago, and at the beginning of the month, I met up with another friend and toured the exhibits at the local art museum.  I'm currently arranging to have dinner with another couple of friends sometime during the first half of November.  All of this is much more than I've done in the past year.  I need to take another blood test, but I'm hopeful that the iron tablets I've been taking (on a revised schedule of alternate days, away from coffee, and in conjunction with vitamin C and lactoferrin) are finally kicking in to reverse my low ferritin levels, which is what I think just depleted my energy starting around this time of year in 2025.  Just taking the iron itself didn't do anything; I had to make those other adjustments (with the help of AI) to get it to work.  I'll schedule another blood test for the first half of November to get some confirmation.

Then there are the other home improvements--the front and back doors in early September downstairs windows in mid-September, and yesterday and this morning, a full rebuild of the chimney and a new chimney liner.  I got three estimates.  Two were done by drone and one by actually going up on the rooftop for a manual inspection.  The two who inspected by drone recommended the same thing--rebuilding just the top, while the one who went up there in person to look recommended a full rebuild.  I live in a twin home and the chimney belongs 50% to the neighbor, so I had to coordinate with her.  We went with a company that did one of the drone inspections.  Then when the workers arrived yesterday and looked in person, they changed the recommendation to a full rebuild.  They said that if they'd recommended the full rebuild at the original estimate, it would have been $3,600 more ($1,800 each), but because this was a last minute change, they brought that down to $3,000.  My neighbor was pretty upset and after she talked with them, they brought the additional down to $2,800 ($1,400 each).  They showed me video, pulling bricks out by hand because there really was no mortar left holding things in, so I know it needed to be done.  Anyways, that job is now complete--and lesson learned, if you are getting any work done on the roof, insist on a manual, not drone, inspection!  

Now I'm just waiting to get a date on the roof installation.  They had someone out here on 10/20 to take measurements and told me they would have a date for me within two weeks, so I should know that soon.  It will be the end of November or the beginning of December.  I went with a Durolast/PVC roof, not a rubber/EPDM roof, which allows installation later in the season (and which is supposed to be more energy-efficient and fire-resistant and have lower long-term maintenance costs, but a higher up-front cost).  So three of this year's four big projects are done!

The Year of Big Capital Improvements

October 6th, 2026 at 01:58 am

This is turning into the year of major capital improvements.  I knew these things were coming up, but hadn't planned to do them all this year.  (And I'm not doing *everything* this year, just a major chunk of what I've planned to do.

So I already posted about the front door replacement, which is the only really visible change.  The back door was replaced the following week.  It's just a plain white door replacing another plain white door, so it didn't make for a compelling reason to post.

Then in mid-September, the downstairs windows were replaced.  Again, not a stunning visual change from the old windows, so not a reason to post.

But while I was musing on the doors and windows, I decided to check on when I had last done the roof.  The last work on the roof was a coating with a 10-year guarantee.  I thought it was done about 9 years ago, but it turns out it was done 11 years ago, so I had the roof inspected.

The first person who came out to look at the roof actually went up on top of the roof.  He is one of only two contractors who went up there themselves.  Everyone else uses a drone these days.

Because my main roof is a flat roof and the house is a twin, with the two roofs connected, the contractor posted the photos he took to a website for me to share with my neighbor, and he indicated that he would only be willing to do the project if we *both* signed on, becauses that was the only way to 100% guarantee no leaks at the join between the properties.  

I talked to my neighbor, and she's not on board for a full tear off and replacement right now.  Her roof was recoated just 5 years ago, but she will be getting it recoated again.

The initial inspector also told me that the chimney needed work and that I should get a chimney specialist to give me a quote on that.

So the past couple of weeks have been a flurry of getting quotes, three each for the roof and the chimney.  I had a couple more appointments scheduled, but I made my decision and signed my contracts today.

It was very helpful to have the photos from the one roofer.  I uploaded them to AI and Ai tagged the roof as really needing a full tear off and replacement.  It pointed out particular photographs and pointed to particular evidence in those photos.  If a roofer had said just said that to me, there's always the worry that they are saying you need a full replacment rather than a repair because it is in their self-interest, but with the AI commentary on the photos, I was persuaded that the full tear off was needed this year.  I also used AI to compare the various contractor quotes, which was helpful in making my decision.  The chimney replacement is scheduled for the 30th of this month, and the roof replacement should occur sometime in November--I'll probably have a date in hand for that tomorrow.

This has all gone on during one of my busy periods at work and in the midst of our penultimate software conversion, so it's been mentally very taxing and I find myself absolutely drained at night.  Fortunately the next two weeks are very light on meetings, so I'll have a chance to catch up, get ahead, and master the final two software conversions before the year-end onslaught of meetings begins.

My mortgage balance (21 years in on a 30 year mortgage, but I've been pre-paying some) is now at $15k.  The HELOC balance is currently $21k and the upcoming roof and chimney will double that.  We get our annual bonus the end of January, so hopefully I'll be able to get that down by a significant fraction in a few months.  So there's more debt back on my balance sheet after 8 months with just the mortgage, but at least it's all home-related debt which will add to what I am able to get for the house when I sell it in 6 or 7 years.